Extracting groundwater through a borewell or tubewell does not always require government permission. The requirement depends on who is extracting the water, how much is used, its purpose and the location.
In India, groundwater extraction is regulated by the Central Ground Water Authority (CGWA) or the respective State Ground Water Authority. The central framework is based on guidelines notified on 24 September 2020 and amended on 29 March 2023.
For industries, commercial establishments, housing projects and mining operations, a Groundwater No Objection Certificate (NOC) may be mandatory before extraction begins.
1. Who Needs a Groundwater NOC?
Under the central guidelines, the following categories generally require an NOC when extracting groundwater, unless a specific exemption applies.
| Category | NOC Requirement |
|---|---|
| Industries and manufacturing units | Required unless exempt |
| Hotels, hospitals and commercial infrastructure | Generally required |
| Mining projects | Generally required |
| Construction projects involving groundwater extraction or dewatering | Generally required |
| Residential apartments and group housing societies | Required above applicable exemption limits |
| Individual households | Exempt for drinking and domestic use |
| Agricultural groundwater use | Exempt under central guidelines |
An existing borewell does not automatically qualify for exemption. Industries and other covered projects using groundwater must comply with the applicable approval requirements even if extraction started earlier.
2. Who Is Exempt from Groundwater NOC?
The CGWA framework provides several exemptions.
| User Category | Exemption |
|---|---|
| Individual households | Drinking and domestic use |
| Agricultural activities | Groundwater extraction for agriculture |
| Rural drinking water supply schemes | Exempt |
| Micro and small enterprises | Extraction below 10 KLD |
| Industries, mining and infrastructure projects | Up to 5 KLD, exclusively for drinking and domestic use |
| Residential apartments and group housing societies | Up to 20 KLD for drinking and domestic use, subject to conditions |
| Armed Forces and Central Armed Police Forces establishments | Exempt |
KLD means kilolitres per day. One kilolitre equals 1,000 litres.
For example, an eligible microenterprise extracting 8,000 litres of groundwater daily may fall within the exemption. A larger industrial unit cannot claim the same exemption merely because its extraction is below 10 KLD.
Similarly, residential societies with swimming pools drawing groundwater must obtain an NOC under the central guidelines.
These exemptions must be assessed alongside applicable state regulations and other conditions.
3. Does CGWA Issue NOCs Across India?
No. Groundwater regulation is shared between central and state authorities.
CGWA issues groundwater NOCs in states and Union Territories under its jurisdiction. Other states have their own groundwater regulatory systems.
According to the Ministry of Jal Shakti’s 2026 parliamentary response, CGWA regulates groundwater withdrawal in 19 states and Union Territories, while the remaining jurisdictions use state-level mechanisms.
This distinction matters because an industry may need groundwater permission even where CGWA is not the issuing authority.
Applicants should first identify the competent authority for their project location.
4. Can an NOC Be Obtained in Over-Exploited Areas?
Groundwater availability also determines whether permission can be granted.
Assessment units are classified as:
- Safe
- Semi-critical
- Critical
- Over-exploited
Restrictions are particularly strict in over-exploited areas.
Under the central guidelines, new industries in over-exploited assessment units generally cannot obtain permission for industrial groundwater extraction, except eligible MSMEs. New packaged drinking water industries do not receive this exception.
Expansion involving increased groundwater withdrawal is also restricted.
The classification of the project location should therefore be checked before planning a new borewell or industrial expansion.
5. How to Apply for a Groundwater NOC
CGWA applications are processed through the official BhuNeer Portal, which replaced the earlier NOCAP system.
Applicants generally need to provide project information, proposed groundwater withdrawal, existing borewell details, water requirements and supporting documents.
Depending on the project, additional requirements may include a groundwater impact assessment, hydrogeological study, water conservation measures and evidence of limited public water supply.
The portal also provides eligibility checks, an online charges calculator and application tracking.
6. What Happens After NOC Approval?
Obtaining an NOC does not end the compliance requirements.
Projects may need to install digital flow meters, maintain groundwater extraction records, monitor groundwater levels, submit compliance reports and pay applicable extraction charges.
Industries extracting more than 100 KLD of groundwater are also required to undertake biennial water audits under the applicable CGWA guidelines.
NOC renewal must generally be requested at least 90 days before expiry.
Extracting groundwater without valid permission or exceeding the approved withdrawal quantity can attract environmental compensation and other regulatory action.
What Should Groundwater Users Check?
Before installing or operating a borewell, businesses and institutions should verify whether an NOC is required, which authority regulates groundwater extraction in their area, and whether local groundwater conditions permit the proposed withdrawal.
An exemption under CGWA guidelines does not automatically remove obligations under applicable state or local regulations.