Mandatory BIS certification is no longer required for packaged drinking water and mineral water in India. Following this change, FSSAI introduced a specific Scheme of Testing to maintain product-safety and quality-control requirements.
The scheme became applicable to food business operators from 1 January 2026. FSSAI states that the earlier mandatory BIS certification requirement was omitted through the notification dated 17 October 2024, after which the new testing framework was introduced to ensure continued safety and compliance.
What Changed?
The regulatory change does not mean that packaged drinking water is free from quality-control requirements.
Instead of relying on mandatory BIS certification, manufacturers must follow the testing, monitoring and record-keeping requirements prescribed under the FSSAI scheme.
For packaged drinking water, manufacturers must maintain test records, ensure conformity of production and comply with applicable food-safety, hygiene and packaging requirements.
Key Testing Requirements
The scheme specifies different testing frequencies for different categories of parameters:
| Testing area | General frequency |
|---|---|
| Microbiological parameters | Monthly |
| Selected chemical parameters | Every three months |
| Pesticide residues | Every six months |
| Full parameter testing | Every six months |
Microbiological monitoring includes parameters such as coliform bacteria, Pseudomonas aeruginosa, yeast and mould, Salmonella, Shigella and Vibrio. Selected chemical parameters include nitrate, nitrite, iron, manganese, copper, zinc, calcium and magnesium.
FSSAI also requires all applicable packaged-drinking-water parameters to be tested at least once every six months.
Source-Water Testing
Source water must be tested before use through an FSSAI-notified NABL-accredited laboratory certified to ISO/IEC 17025.
If the source of raw water changes or a new source is added, it must undergo complete testing before it can be used for regular production.
Packaging Requirements
The scheme also covers packaging quality.
Plastic jars, bottles and closures are subject to migration and packaging-conformity testing, generally at six-month intervals. Manufacturers must also maintain relevant supplier and test records for packaging materials.
Reusable plastic containers are permitted for capacities of 5 litres and above, provided they remain durable and suitable for cleaning and disinfection.
What Happens if a Test Fails?
If microbiological non-compliance is detected, affected stock must be rechecked and corrective action taken before normal production and dispatch resume. FSSAI requires satisfactory microbiological results for five consecutive batches following such corrective action.
For other failed parameters, testing frequency may increase to monthly until three consecutive batches are found compliant. Repeated non-compliance can also trigger risk-based inspection by FSSAI.
Key Takeaway
The shift away from mandatory BIS certification has not removed quality-control obligations for packaged drinking water.
From 1 January 2026, FSSAI’s Scheme of Testing provides the operational framework for ongoing quality monitoring through scheduled microbiological, chemical, pesticide, source-water and packaging checks.
For manufacturers, the focus is now on continuous testing, traceable records and documented corrective action rather than reliance on a single certification requirement.